Fit for the future

New warehouse and logistics system

In 2012 Karcher GmbH reached its capacity at our existing warehouse due to large increases in sales. In late 2012 we built a new facility adjacent to the existing warehouse and also introduced a new logistics system.

In early 2013 we moved into our new warehouse. We can now accommodate over 2500 pallets and, along with a new fleet of warehouse vehicles, are fitted with the latest logistics technology. This includes a lean lift, an innovative machine which is designed to optimize our storage of smaller intricate parts.

With the new software now in place efficiency has greatly improved.  Procedures have been optimised and simplified to reduce our delivery times.

The first priority of our enterprise is to fulfil our clients’ needs and wishes and deliver a fast and effective service. We have made ourselves fit for the future and are ready to process your orders!

DESIGNS IN RVS

Karcher Design internationaal

Adres

Karcher GmbH Design-Beschläge

Raiffeisenstraße 32
D-74906 Bad Rappenau

Tel: +49 7264-9164-0

Copyright 2026 Karcher Design. All Rights Reserved.

Bezoek onze Facebook-pagina

Privacyinstellingen
Technisch noodzakelijke cookies worden altijd geladen.
You are using an outdated browser. The website may not be displayed correctly.